Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home/ra400023/jofer-old.ditraligroup.es/wp-content/plugins/qtranslate-x/qtranslate_frontend.php on line 497

Warning: Parameter 2 to qtranxf_postsFilter() expected to be a reference, value given in /home/ra400023/jofer-old.ditraligroup.es/wp-includes/class-wp-hook.php on line 341
Project in Nuevos Ministerios building in Almería – Jofer
Warning: Parameter 2 to qtranxf_postsFilter() expected to be a reference, value given in /home/ra400023/jofer-old.ditraligroup.es/wp-includes/class-wp-hook.php on line 341

Blog

Todas as notícias do setor

Project in Nuevos Ministerios building in Almería

Since october 2017 we are doing a new intervention in the Nuevos Ministerios building in Almería.

In this project we are changing the placement of almost 100 equipments, in coordination with the waterproofing of the roof surface. It is a work that will last approximately 5 months.

In their new placement, the equipments are based in Big Foot systems, so it ensures an absolute insultation, as far as vibrations are concerned. Certainly we are doing the completion of the machines to guarantee their correct functioning.


Warning: Parameter 2 to qtranxf_postsFilter() expected to be a reference, value given in /home/ra400023/jofer-old.ditraligroup.es/wp-includes/class-wp-hook.php on line 341